Office Projects

366 Madison Ave_Facade

366 Madison Ave_Facade

Location: 366 Madison Ave, New York, NYClient: Ponte Gadea Madison LLCArchitect: Facade MDConstruction Manager: JC ContractingDuration: (14) monthsProject Description: Exterior Masonry RepairsRole: Project and Construction Management/ Owner's Representative

Morrison Foerster

Morrison Foerster

Location: 600 Brickell Avenue, Miami, FLClient: Morrison FoersterArchitect: OTJConstruction Manager: SkyConDuration: (6) monthsProject Description: Office Suite modification with build-out of separate Conference Center Suite.  Oversee relocation, reception branding,...

IPD Analytics

IPD Analytics

Location: 19950 W. Country Club Drive, Seventh Floor, Aventura, FLClient: IPD AnalyticsArchitect: G. Alvarez StudioConstruction Manager: Stambul Construction & RenovationDuration: 6 monthsProject Description: Full Floor Tenant Improvement build-out, Construction...

Concacaf

Concacaf

Location: 3 Main Central, Miami, FLClient: CONCACAF, Inc.Architect: StantecConstruction Manager: Terracon Group, Inc.Duration: (6) monthsProject Description: 17,224 SF Interior Office ImprovementsRole: Project  Management

255 Alhambra Circle – Lobby Renovation

255 Alhambra Circle – Lobby Renovation

Location: 255 Alhambra CirleClient: RREEFArchitect: StantecConstruction Manager: Perillo ConstructionDuration: 8 monthsProject Description: 4,599 RSFRole: Project and Construction Management

Rumberger Law

Rumberger Law

Location: 80 SW 8 Street, Miami, FLClient: Rumberger, Kirk & Caldwell – Trial AttorneysArchitect: G. Alvarez StudioInterior Designer: G. Alvarez StudioConstruction Manager: RG Construction Consultant, Inc.Duration: (7) monthsProject Description: Phased interior...

Waterford

Waterford

Location: 5757, 5775, 5805 and 6161 Blue Lagoon Drive, Miami FLClient: Ivy RealtyArchitect: KravitConstruction Manager: Rothstar and WellingtonDuration: (2) yearsProject Description: Phase the renovations of the common corridor, elevator lobbies and restrooms for each...

G. Alvarez Studio

G. Alvarez Studio

Location: 800 S. Douglas Rd, Coral Gables, FLClient: G. Alvarez StudioArchitect: G. Alvarez StudioConstruction Manager: Perillo ConstructionDuration: (8) monthsProject Description: 3,500 RSFRole: Project  Management